Summary
Construction of: base bid: new fuel farm additive alternate no. 1: electrical lighting for charlie ramp additive alternate no. 2: blast deflection system additive alternate no. 3: stainless steel fuel farm piping at mcghee tyson airport (tys). Base Bid Scope Of Work: 1. Buildings 2. fuel farm systems, 3. electrical systems 4. mechanical systems 5. fire alarm systems 6. landscape 7. IT, communications systems, and security systems (access control and surveillance) 8. wayfinding and signage 9. erosion and sediment control measures 10. fencing and gates 11. building pavements 12. Other Miscellaneous Items ADDITIVE ALTERNATE NO. 1: ELECTRICAL LIGHTING FOR CHARLIE RAMP The Work shall include but not limited to: - design of the final lighting system with light pole foundations, - erosion and sediment control measures, - construction safety and phasing measures, - temporary facilities, - earthwork installation of mast electrical lighting system (foundation, masts and lighting fixtures), - surveillance systems, IT and communications systems - site reclamation. ADDITIVE ALTERNATE NO. 2: BLAST DEFLECTION SYSTEM 1. The Work shall include but not limited to: - design of blast deflection system - erosion and sediment control measures, - construction safety and phasing measures, - temporary facilities, - earthwork, - installation of blast defection system - site reclamation ADDITIVE ALTERNATE NO. 3: STAINLESS STEEL FUEL FARM PIPING AND FITTINGS 1. Provide stainless steel piping, fittings, and general valves (ball valves, check valves, etc.) in place of coated carbon steel piping, fittings, and valves.