Summary
New construction of a public restroom building. The new building will replace the existing restroom building in its current location. The existing restroom building will be removed in its entirety along with its concrete slab, foundation and concrete apron. The new restroom will consist of three accessible unisex bathrooms, including a family restroom. The new restroom building work will include minor site work, concrete footings, masonry foundation and masonry/stud walls, brick and siding exterior walls, shingle roof, gutters and downspout, new doors and frames, new plumbing fixtures and connections, relocated plumbing rough-ins to tie into the existing plumbing, extensions or capping of existing plumbing piping and toilet accessories.