Summary
Furnish and Install Encasement Pipe by Jacking and Boring: Work may include, but not limited to: Pipe Work (Cooper Pipe, Ductile Iron Pipe, PVC/CPVC Pipe), Water, Hauling, Erosion & Sediment Control, Traffic Control, Project Signs, Utility Structures, Temporary Utilities, Concrete Work/Precast Concrete, Cast-in-Place Concrete, Grout, Galvanizing, Basic Mechanical, Paving & Surface Restoration, Asphalt Milling, Valves (General Air Valves, Gate), Aggregate Base Material, Stone, Seeding, Mulching, Earthwork, Clearing & Grubbing, Site Prep/Grading, Landscaping, Metals (Material & Fastening), Castings, Site Demolition, Rock Removal, Geo-Textile, Fencing/Gates, Quality Control/Testing Services, Fire Hydrants/Fire Protection, Excavation by Blasting, Temporary Excavation Support Systems, Horizontal Auger Boring, Removal & Disposal of Contaminated Soils, Flowable Fill, Confined Space Entry Plan, Contractors Access & Parking, Temporary Controls, along with any incidentals and materials necessary for construction to complete the project.