Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
11,625 SF demolish existing trail; 10 ea remove existing trees; 2,134 SY of 6" penndot 2A stone subbase; 2,134 SY of 12' wide asphalt walking trails; 308 SF concrete pad; 260 SF of 5' wide concrete walkway; 55 SF concrete sidewalk along a marshall road; 1 ea detectable wearing surface (DWS); 8 LF sawcut & remove existing curbing; 8 LF depressed curbing; 4 ea removable bollard; 815 LF infiltration trench (incl, pipe, clean stone & fabric); 20 ea 2-5" caliper share tree; 1 LF electrical conduit & junction boxes for site lighting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project generally includes the construction of approx. 2,419 LF of shared-use recreational trail. Improvements also include drainage, striping, signage, conversion of a street to a share trail. Section of the path will utilize existing bridge lane that will be reconfigured to include share trail. Also includes 231 CY of unclassified excavation; 83 CY of compacted embankment; 31 gal. of tack coat; 25 LF of 18" class III RCP culverts; see attached files.
Posted Date
Oct 16, 2025
Due Date
Dec 18, 2025
Release: Oct 16, 2025
Close: Dec 18, 2025
The project generally includes the construction of approx. 2,419 LF of shared-use recreational trail. Improvements also include drainage, striping, signage, conversion of a street to a share trail. Section of the path will utilize existing bridge lane that will be reconfigured to include share trail. Also includes 231 CY of unclassified excavation; 83 CY of compacted embankment; 31 gal. of tack coat; 25 LF of 18" class III RCP culverts; see attached files.
AvailablePurchase of pit run for use on parish roads.
Posted Date
Dec 10, 2025
Due Date
Dec 30, 2025
Release: Dec 10, 2025
Close: Dec 30, 2025
Purchase of pit run for use on parish roads.
AvailableWork consists of Tonquin Trail Accessibility.
Posted Date
Nov 25, 2025
Due Date
Jan 8, 2026
Release: Nov 25, 2025
Close: Jan 8, 2026
Work consists of Tonquin Trail Accessibility.
AvailableProvide Pit-Run Gravel.
Posted Date
Dec 10, 2025
Due Date
Dec 29, 2025
Release: Dec 10, 2025
Close: Dec 29, 2025
Provide Pit-Run Gravel.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis