Summary
Construction of an ADA ramp at the north entrance; restoration of the exterior steel windows on the north facade of the north metal building and the south facade of the south metal building, including replacement of missing steel sashes and replacement of 6 non- original windows on the south facade; restoration and painting of the two (north and south) facades; restoration of the 3 metal building roofs including abatement of an asbestos coating and a new fluid-applied roof coating (white), and installation of new gutters and downspouts where missing. Also, interior renovation includes completion of the north end of the building into office space for golf pro and assistant, completion of hall, mechanical and electrical improvements, and construction of new pro shop storage room the metal building.