Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide MYERS Batteries.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide bluefors system wires. DC Installation Set: Kf40 flange 1x Fischer. 12x TWP Cu RT to 4K 12x NbTi/CuNi 4K to MXC. Shielding for 12 twisted wire pairs. See attached file.
Posted Date
Jan 8, 2026
Due Date
Jan 23, 2026
Release: Jan 8, 2026
Close: Jan 23, 2026
Provide bluefors system wires. DC Installation Set: Kf40 flange 1x Fischer. 12x TWP Cu RT to 4K 12x NbTi/CuNi 4K to MXC. Shielding for 12 twisted wire pairs. See attached file.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide spectrum instrumentation. M5i.3321-x16 / PCI Express 3.2 GS/s 12 Bit Digitizer with PCI Express x16 Gen3 Interface, 2 slots width 2 channels 12 bit 3.2 GS/s 1 GHz Bandwidth, fixed 50 Ohm Input ranges: ±200 mV, ±500 mV, ±1 V, ±2.5 V 2 GSample memory, streaming up to 12.8 GB/s - QTY 1.0000 / EA. See attached file.
Posted Date
Dec 29, 2025
Due Date
Jan 14, 2026
Release: Dec 29, 2025
Close: Jan 14, 2026
Provide spectrum instrumentation. M5i.3321-x16 / PCI Express 3.2 GS/s 12 Bit Digitizer with PCI Express x16 Gen3 Interface, 2 slots width 2 channels 12 bit 3.2 GS/s 1 GHz Bandwidth, fixed 50 Ohm Input ranges: ±200 mV, ±500 mV, ±1 V, ±2.5 V 2 GSample memory, streaming up to 12.8 GB/s - QTY 1.0000 / EA. See attached file.
AvailableProvide assorted ferguson hardware, no equivalents or substitutions. B410400BFA01066 QTY: 10.0000 EA. FNW4715P QTY: 4.0000 EA. TYS61S0400P QTY: 4.0000 EA.
Posted Date
Dec 24, 2025
Due Date
Jan 14, 2026
Release: Dec 24, 2025
Close: Jan 14, 2026
Provide assorted ferguson hardware, no equivalents or substitutions. B410400BFA01066 QTY: 10.0000 EA. FNW4715P QTY: 4.0000 EA. TYS61S0400P QTY: 4.0000 EA.
AvailableProcurement of sixteen (16) charge readout plane support superstructures (CRP-SSTs) for the Deep Underground Neutrino Experiment (DUNE) Vertical Drift (VD) detector.
Posted Date
Jan 8, 2026
Due Date
Jan 15, 2026
Release: Jan 8, 2026
Close: Jan 15, 2026
Procurement of sixteen (16) charge readout plane support superstructures (CRP-SSTs) for the Deep Underground Neutrino Experiment (DUNE) Vertical Drift (VD) detector.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →