Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide door replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
Premium
Access the largest public sector contact database
The City of Bend invites sealed bids for the Galveston Ave. Pressure Reducing Valve Replacement Project to install a new 6-inch pressure reducing valve (PRV) in a precast utility vault and connect it to the existing water system with ~150 linear feet of 8-inch ductile iron main. Work includes reconfiguration of existing piping and valves at NW 17th Street and Galveston Ave, plus surface restoration (2-inch grind and inlay ~455 sq yd) and necessary traffic/erosion control. The project is an ITB (construction) with performance to begin upon NTP (no later than 2026-03-02) and completion by 2026-06-19.
Competitive bids are requested from subcontractors and suppliers for elementary school renovations at Northlake ES, Rowlett ES, and Toler ES.
Posted Date
-
Due Date
Dec 19, 2025
Close: Dec 19, 2025
Competitive bids are requested from subcontractors and suppliers for elementary school renovations at Northlake ES, Rowlett ES, and Toler ES.
AvailableRelease: Dec 2, 2025
Close: Dec 23, 2025
Alcott ES-Peirce ES - Capital CIP.
AvailableConstruction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.
Posted Date
Dec 3, 2025
Due Date
Jan 8, 2026
Release: Dec 3, 2025
Close: Jan 8, 2026
Construction of the Galveston Ave. Pressure Reducing Valve Replacement Project. The work includes installation of a new 6" pressure reducing valve (PRV) within a precast utility vault, along with all associated piping, fittings, and ancillary valves required for proper operation. The new vault will be connected to the existing water system through approx. 150 LF of 8" ductile iron water main with restrained joints. The scope also includes reconfiguration of existing piping and valves in the intersection of NW 17th Street and Galveston Avenue as necessary to integrate and ensure proper operation of the new PRV. Surface restoration will include a 2" grind and inlay of approx. 455 SY of asphalt pavement and any necessary curb replacement. Traffic control and erosion control are required as part of the work.