Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Keeping city funds.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Municipal depository for special and surplus funds
Posted Date
Jan 26, 2026
Due Date
Feb 23, 2026
Release: Jan 26, 2026
Close: Feb 23, 2026
Municipal depository for special and surplus funds
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Municipal depository for special and surplus funds
Posted Date
Jan 26, 2026
Due Date
Feb 23, 2026
Release: Jan 26, 2026
Close: Feb 23, 2026
Municipal depository for special and surplus funds
AvailableThe Project consists of one (1) Base Bid, four (4) Add Alternates. The base bid includes demolition of various above & below grade site improvements & buildings, with asbestos abatement. Additionally, the base bid includes, construction of porous & non-porous asphalt walks & drives, concrete sidewalks, reinforced concrete driveways, concrete curb, lighting improvements, utility improvements, electrical improvements including service connections, stormwater improvements, a timber pedestrian bridge with footings, a bath house, a pavilion, & various pool facilities. Add Alternates No. 1 through 4 bid includes the construction of a field house, an open pavilion, a concession stand, and various playground improvements, respectively. The Work under this Contract consists of one (1) Base Bid and four (4) Add Alternates. The Base Bid includes the construction of a 5,092 SF bath house, a new swimming pool, lazy river, splash pad, a 4,014 SF four-season pavilion, and associated site improvements, including parking areas, sidewalks, site lighting, and utility improvements. Add Alternates No. 1 through No. 4 include, respectively, the construction of a 3,478 SF field house, an 865 SF open pavilion, various playground improvements, and a 958 SF concession stand.
Posted Date
Oct 30, 2025
Due Date
Feb 12, 2026
Release: Oct 30, 2025
Close: Feb 12, 2026
The Project consists of one (1) Base Bid, four (4) Add Alternates. The base bid includes demolition of various above & below grade site improvements & buildings, with asbestos abatement. Additionally, the base bid includes, construction of porous & non-porous asphalt walks & drives, concrete sidewalks, reinforced concrete driveways, concrete curb, lighting improvements, utility improvements, electrical improvements including service connections, stormwater improvements, a timber pedestrian bridge with footings, a bath house, a pavilion, & various pool facilities. Add Alternates No. 1 through 4 bid includes the construction of a field house, an open pavilion, a concession stand, and various playground improvements, respectively. The Work under this Contract consists of one (1) Base Bid and four (4) Add Alternates. The Base Bid includes the construction of a 5,092 SF bath house, a new swimming pool, lazy river, splash pad, a 4,014 SF four-season pavilion, and associated site improvements, including parking areas, sidewalks, site lighting, and utility improvements. Add Alternates No. 1 through No. 4 include, respectively, the construction of a 3,478 SF field house, an 865 SF open pavilion, various playground improvements, and a 958 SF concession stand.
AvailableAlta Municipal Utilities (Iowa) is rebidding the furnishing of minor materials for its Phase 1 Electric Distribution Improvements project. Materials include items such as primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, and overhead materials. The rebid was posted January 14, 2026, with bids due February 11, 2026, and documents distributed through QuestCDN.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Alta Municipal Utilities (Iowa) is rebidding the furnishing of minor materials for its Phase 1 Electric Distribution Improvements project. Materials include items such as primary cable fittings, primary and secondary pedestals, secondary connectors, fault indicators, cable sealing and identification material, grounding materials, and overhead materials. The rebid was posted January 14, 2026, with bids due February 11, 2026, and documents distributed through QuestCDN.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →