The Naval Facilities Engineering Command (NAVFAC) issued Combined Synopsis/Solicitation N4008526R9049 for 'Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning' to perform heated chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters across Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. The procurement is a Total Small Business set-aside (NAICS 236220), has a 365-day period of performance after award, and requires bidders to be on the approved Mechanical MACC contractors list and to provide required bid/payment bonds. The solicitation was posted on 2026-07-06 and proposals are due 2026-08-05 at 3:00 p.m. EDT (see SAM.gov posting for attachments and response instructions).
The Naval Facilities Engineering Command (NAVFAC) issued Combined Synopsis/Solicitation N4008526R9049 for 'Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning' to perform heated chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters across Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. The procurement is a Total Small Business set-aside (NAICS 236220), has a 365-day period of performance after award, and requires bidders to be on the approved Mechanical MACC contractors list and to provide required bid/payment bonds. The solicitation was posted on 2026-07-06 and proposals are due 2026-08-05 at 3:00 p.m. EDT (see SAM.gov posting for attachments and response instructions).
The Naval Facilities Engineering Command (NAVFAC) issued Combined Synopsis/Solicitation N4008526R9049 for 'Multiple Location BEQ Chiller Loop Flushing and Chemical Cleaning' to perform heated chemical cleaning, flushing, and passivation of chilled water closed-loop systems serving Bachelor Enlisted Quarters across Marine Corps Base Camp Lejeune and Marine Corps Air Station New River. The procurement is a Total Small Business set-aside (NAICS 236220), has a 365-day period of performance after award, and requires bidders to be on the approved Mechanical MACC contractors list and to provide required bid/payment bonds. The solicitation was posted on 2026-07-06 and proposals are due 2026-08-05 at 3:00 p.m. EDT (see SAM.gov posting for attachments and response instructions).
Project will consist of a qualified contractor removing existing pipe sections/ couplers and replacing with new pipe, couplers, and valves for improved performance of the wastewater reclamation facility scum pumps
Project will consist of a qualified contractor removing existing pipe sections/ couplers and replacing with new pipe, couplers, and valves for improved performance of the wastewater reclamation facility scum pumps
Interior renovations; installation of lightning protection; milling, overlaying, and striping of the parking lot; replacement of sidewalks including demolition, sub-grade preparation, permits, and replacement; unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.); unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.); unforeseen Lead removal; removal, disposal, and replacement of unsuitable soil (non-contaminated); removal, disposal, and replacement of unforeseen buried utilities (concrete duct banks, piping, cable, etc.); formal partnering; replacement of 10% of the existing roof underlayment and plywood sheathing, and replacement of 5 damaged roof trusses; landscaping including landscape bed surrounding beq with Aluminum edging, landscape weed control fabric, river rock, and ornamental grass to be executed at the end of construction.
Repair the Bachelor Enlisted Quarters Building G702. Building G702 is a 37,825 square footage Bachelor Enlisted Quarters facility that was built in 1999.
Repair the Bachelor Enlisted Quarters Building G702. Building G702 is a 37,825 square footage Bachelor Enlisted Quarters facility that was built in 1999.
Interior renovations; installation of lightning protection; milling, overlaying, and striping of the parking lot; replacement of sidewalks including demolition, sub-grade preparation, permits, and replacement; unforeseen asbestos containing material (ACM) (piping, pipe insulation, HVAC insulation, etc.); unforeseen asbestos containing material (ACM) (Adhesives, vinyl floor tiles, wall and ceiling insulation, roofing, etc.); unforeseen Lead removal; removal, disposal, and replacement of unsuitable soil (non-contaminated); removal, disposal, and replacement of unforeseen buried utilities (concrete duct banks, piping, cable, etc.); formal partnering; replacement of 10% of the existing roof underlayment and plywood sheathing, and replacement of 5 damaged roof trusses; landscaping including landscape bed surrounding beq with Aluminum edging, landscape weed control fabric, river rock, and ornamental grass to be executed at the end of construction.