Summary
Work includes the construction of approximately: 0.2 Acres Grubbing; 3500 Ton Bituminous; 2 Each Salvage Tree; 32 LF 16 x 10 Precast Box Culvert; 120 LF Remove & Replace Curb & Gutter; 225 LF 12” to 27” RCP Culvert; 253 CY Stabilizing Aggregate; 293 Tons Random Rip-Rap CL III; 9,284 CY Common Excavation; 905 SF Concrete Walk 6"; 636 CY Channel and Pond Excavation 114 SF Truncated Domes; 3,325 CY Select Granular Embankment; 8.2 Acres Seeding; 5,260 SY Geotextile Fabric Type V; 4,700 LF 4” - 6” Striping; 373 CY Aggregate Surfacing; 320 SF Pavement Message; 6,393 CY Class 5 Aggregate Base together with numerous related items of work, all in accordance with Plans and Specifications.