Summary
Work includes approx. 2,581 LF of pipebursting 6" existing clay sewer lines to 8" SDR 17 IPS HDPE; 100 LF of installation of 8" SDR 26 PVC by bore and open cut; 139 LF of 10" SDR 26 PVC by open cut; 90 LF of installation of 20" HDPE encasement by bore; replacement of 3 sanitary sewer concrete manholes; bench repair for 11 sanitary sewer manholes associated with the pipe bursting; pre and post CCTV and cleaning; clearing, grubbing, earthwork, seeding, and erosion control; site grading; miscellaneous appurtenances; safety systems; items of construction work and/or materials not specifically addressed herein, but nonetheless required for a complete, operating, and acceptable installation of the work, shall be considered subsidiary to the applicable bid items, and the cost thereof shall be considered to be included.