Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Town of Loomis is soliciting bids for the Montserrat Equestrian Trail Repair Project, which includes ripping the surface, grading, establishing positive drainage, and installing decomposed granite paving. The estimated project cost is between $100,000 and $200,000, with a project duration of 20 working days and prevailing wage and licensing requirements (Class A or C-12 and Town business license). Bidders must submit a 10% bid guarantee and perform at least 30% of work with their own employees and equipment.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Los Angeles Bureau of Engineering seeks a consultant to develop an Equestrian Trail Connection Plan for the Northeast San Fernando Valley. This Task Order Solicitation is limited to firms on the BOE Pre‑Qualified On‑Call Architectural and Other Professional Services Consultants List (Tier 2).
Posted Date
-
Due Date
Jan 9, 2026
Close: Jan 9, 2026
The City of Los Angeles Bureau of Engineering seeks a consultant to develop an Equestrian Trail Connection Plan for the Northeast San Fernando Valley. This Task Order Solicitation is limited to firms on the BOE Pre‑Qualified On‑Call Architectural and Other Professional Services Consultants List (Tier 2).
Premium
Access the largest public sector contact database
Trailheads and Trail Connections Project.
Posted Date
Nov 26, 2025
Due Date
Dec 19, 2025
Release: Nov 26, 2025
Close: Dec 19, 2025
Trailheads and Trail Connections Project.
AvailableTrail phase 2 project.
Posted Date
Nov 24, 2025
Due Date
Dec 16, 2025
Release: Nov 24, 2025
Close: Dec 16, 2025
Trail phase 2 project.
AvailableWork generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
Posted Date
Nov 12, 2025
Due Date
Jan 7, 2026
Release: Nov 12, 2025
Close: Jan 7, 2026
Work generally includes: clearing of approx. 4,750 LF of trail path, excavation of trail path to a width of ten feet and depth of 12", installation of approx. 70 tons of gravel, and installation of three 20' drainage/culvert pipes within the project area; as well as reseeding of all disturbed areas.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis