Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Project includes Approx. 200 LF Demolition/72" RCP pipe removal/disposal; 200 LF 72" RCP storm drain; 60 CY curb and gutter(3500 PSI)(includes removal of exist.); 510 SY remove asphalt paving; 300 SY asphalt paving (4" thick, includes geogrid); See Outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Removal and replacement of miscellaneous bituminous parking lot pavement.
Posted Date
Dec 3, 2025
Due Date
Jan 14, 2026
Release: Dec 3, 2025
Close: Jan 14, 2026
Removal and replacement of miscellaneous bituminous parking lot pavement.
AvailablePremium
Access the largest public sector contact database
Parking Lot Maintenance and Pavement Repairs Project.
Posted Date
Nov 9, 2025
Due Date
Dec 17, 2025
Release: Nov 9, 2025
Close: Dec 17, 2025
Parking Lot Maintenance and Pavement Repairs Project.
AvailableConvert the parking lot lights at the technology center building to LED. This conversion will reduce costly repairs for bulb and ballast replacements each year along with energy savings that are realized from led lighting. Additionally, this will reduce maintenance regarding the parking lot lights at the technology center which often requires an outside contractor to service these lights prior to the winter months to ensure the parking lots are adequately lit.
Posted Date
Nov 20, 2025
Due Date
Dec 12, 2025
Release: Nov 20, 2025
Close: Dec 12, 2025
Convert the parking lot lights at the technology center building to LED. This conversion will reduce costly repairs for bulb and ballast replacements each year along with energy savings that are realized from led lighting. Additionally, this will reduce maintenance regarding the parking lot lights at the technology center which often requires an outside contractor to service these lights prior to the winter months to ensure the parking lots are adequately lit.
Work includes sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots.
Posted Date
Dec 8, 2025
Due Date
Dec 19, 2025
Release: Dec 8, 2025
Close: Dec 19, 2025
Work includes sealcoating, crack sealing, pothole repairs, vegetation removal, and restriping of existing asphalt at designated overflow and station parking lots.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis