Summary
The Monroe Avenue Drainage Improvement Project consists of the repair and re-stabilization of damaged articulated block ditch with additional roadside ditch re-grading and culvert replacement. Scope of work includes preparing the surface along the area of articulated block for installation of a Concrete Canvas overlay with sandbag ditch blocks. Additional existing damaged concrete ditch will be
removed, re-graded and re-paved. The ditch front slopes will be re-graded to meet minimum clear zone requirements with appropriate permanent erosion control measures. The existing double 36" arch pipe culvert will be open cut, removed and replaced with a cast-in-place box culvert and new straight end walls. Roadway reconstruction, milling and resurfacing of adjacent pavement with curb and gutter installation will be required.