Summary
Work includes installation of approx 245 LF of 6" curb and approx 4,900 SF of sidewalk. Saw cutting existing concrete as necessary. Demolition and removal of approx 4,900 SF of existing concrete sidewalk. Removal and disposal of all demolished materials. Excavation and grading as required. Installation of a compacted aggregate subbase. Installation of approx 4,900 SF of new 4" reinforced concrete sidewalk.Installation of integral concrete curbing along sidewalk edges where indicated. Construction of two (2) ADA-compliant accessible access areas with slip-resistant finish, including detectable warning surfaces.