Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase, delivery and site installation of modular offices for the town's public works offices.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Operating, financing and construction services for the cumberland public works building.
Posted Date
Jan 19, 2026
Due Date
Feb 9, 2026
Release: Jan 19, 2026
Close: Feb 9, 2026
Operating, financing and construction services for the cumberland public works building.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking to conduct a public works department staffing study.
Posted Date
Jan 8, 2026
Due Date
Feb 3, 2026
Release: Jan 8, 2026
Close: Feb 3, 2026
Seeking to conduct a public works department staffing study.
Seeking qualified general contractors for the construction of a 56,825 SF Public Works north garage addition, the renovation of the Public Works south garage, the renovation of the Public Works locker/restrooms, the installation of a new generator, all associated HVAC, structural, life safety, paving, stormwater and utility work, and all other work as detailed in Exhibit A – Site Drawings and Exhibit B – Project Specifications. See outside link.
Posted Date
Jan 7, 2026
Due Date
Feb 18, 2026
Release: Jan 7, 2026
Close: Feb 18, 2026
Seeking qualified general contractors for the construction of a 56,825 SF Public Works north garage addition, the renovation of the Public Works south garage, the renovation of the Public Works locker/restrooms, the installation of a new generator, all associated HVAC, structural, life safety, paving, stormwater and utility work, and all other work as detailed in Exhibit A – Site Drawings and Exhibit B – Project Specifications. See outside link.
AvailableWork consists of animal services modular shelter installation project. The project includes the installation of two (2) 20' x 60' pre-manufactured modular kennel buildings, each designed to house twelve dog runs and twelve dog boxes, increasing the shelter's intake capacity and improving animal welfare conditions.
Posted Date
Jan 6, 2026
Due Date
Feb 9, 2026
Release: Jan 6, 2026
Close: Feb 9, 2026
Work consists of animal services modular shelter installation project. The project includes the installation of two (2) 20' x 60' pre-manufactured modular kennel buildings, each designed to house twelve dog runs and twelve dog boxes, increasing the shelter's intake capacity and improving animal welfare conditions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →