Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Professional services for the mobility - trabue road - bolingbrook drive to tenagra way. Project consists of installing a shared use path (SUP) along the south side of Trabue Road from Bolingbrook Drive to Tenagra Way. The western and eastern limits will tie into an SUP constructed by previous projects, 3380-E and 3861-E, respectively. Installation of the SUP will require an evaluation of preliminary engineering concepts to address the SUP conflicting with the existing open drainage channel, the Leib and Parker Ditch. Sidewalk will also be installed along the north side of Trabue Road from Westbelt Drive to Tenagra Way. The signalized intersection at Trabue Woods will require modifications to the push buttons and pedestrian heads. Street lighting will be installed along Trabue Road from Bolingbrook Drive to Tenagra Way. The existing roadway right-of-way along Trabue Road will be annexed as part of this project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
For 2025 road way improvements.
Posted Date
-
Due Date
Dec 22, 2025
Release: -
Close: Dec 22, 2025
For 2025 road way improvements.
AvailableReplace the undersized, deteriorating water main, address the drainage conditions and improve the roadway surface on Cherry Drive between Linden Road and Middlebrook Road. The drainage along Cherry Drive will also be addressed and constructed to contain the flow along the roadway and connect with the natural flow away from the surrounding area.
Posted Date
Nov 14, 2025
Due Date
Dec 18, 2025
Release: Nov 14, 2025
Close: Dec 18, 2025
Replace the undersized, deteriorating water main, address the drainage conditions and improve the roadway surface on Cherry Drive between Linden Road and Middlebrook Road. The drainage along Cherry Drive will also be addressed and constructed to contain the flow along the roadway and connect with the natural flow away from the surrounding area.
AvailableTerminal drive & supply chain road site clearing.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
Terminal drive & supply chain road site clearing.
AvailableRelease: Dec 10, 2025
Close: Jan 13, 2026
Road projects.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis