Howard County
The installation of approx 3,900 LF of 6", 8", 12", and 14" water distribution main loop . including crossing Interstate Highway I-95 inside an existing pipe/casing, a new pressure zone division valve, new fire hydrants, traffic control, surface restoration, soil erosion and sediment control plan
Village of Long Grove
Installation of approx., 1,500 LF of 12" ductile iron water main constructed by both open-cut and trenchless methods. The work also includes the installation of a steel casing pipe beneath aptakisic road by jacking and boring methods. Major work items include, but are not limited to, the installation of approximately 1,500 LF of 12" ductile iron water main, steel casing pipe, fire hydrants, valve vaults, trench backfill, pavement patching, and site restoration.
City of LaBelle
Work includes construction of approximately 13,600 linear feet of 12" pvc (dr-18) water main by open cut, 400 linear feet of 12" pvc (dr-14) water main by open cut, and two (2) linear feet of 10" pvc (dr-18) water main by open cut with associated fittings, twenty-eight (28) fire hydrants, twenty-eight (28) 12" vertical gate valves, and two (2) 10" vertical gate valves. Connections to the existing water main will be made at two (2) points by using fittings such as tapping sleeve and valve. Eight (8) connections for future development are proposed to be included.
City of Prairieburg
Work in general consists of the installation of approx. 980 LF of 4" PVC water main with related appurtenances and surface repair.
Release
Sep 08, 2025
Close
Nov 12, 2025