Retrieving RFP details
Release
Close
City of Prairieburg
Work in general consists of the installation of approx. 980 LF of 4" PVC water main with related appurtenances and surface repair.
Seminole County
Construction of a new sewer force main and reclaimed water main. The project involves the furnishing and installation of a new force main and reclaimed water main, which will be installed through open cut along the easement. The force main will be extended using directional drilling techniques. The existing gravity sewer main lacks the capacity to accommodate future flows from upcoming developments. Asphalt Removal and Replacement 1790 sy, Concrete Driveway and Sidewalk Removal and Replacement 75 sy, Concrete Curb and Gutter Replacement 26 lf, Landscape Restoration, Sodding and Hedges 41859 sf, 10" PVC Force Main - Open Cut 1989 lf, 10" HDPE Force Main - HDD 1797 lf, 12" PVC Reclaimed Water - Open Cut 1504, 12" HDPE Reclaimed Water - HDD 212 lf, Connection to Existing Wet Well - Lockwood Blvd 1 ea. See outside link or attached files.
Howard County
The installation of approx 3,900 LF of 6", 8", 12", and 14" water distribution main loop . including crossing Interstate Highway I-95 inside an existing pipe/casing, a new pressure zone division valve, new fire hydrants, traffic control, surface restoration, soil erosion and sediment control plan
Borough of Mount Penn
Installation of approx. 760 LF of 8" ductile iron water main, 110 LF of 4" ductile iron water main, appurtenances, and reconnection of approx. 13 existing water services
Release
Oct 16, 2025
Close
Nov 06, 2025