Retrieving RFP details
Release
Close
Village of Long Grove
Installation of approx., 1,500 LF of 12" ductile iron water main constructed by both open-cut and trenchless methods. The work also includes the installation of a steel casing pipe beneath aptakisic road by jacking and boring methods. Major work items include, but are not limited to, the installation of approximately 1,500 LF of 12" ductile iron water main, steel casing pipe, fire hydrants, valve vaults, trench backfill, pavement patching, and site restoration.
City of Salisbury
Construction of a 16" water main extension, 8" water main and includes installation of the water main by horizontal directional drilling. The work also includes removal of existing roadway pavement for the installation of new 16" and 8" water mains. It also includes full depth pavement reconstruction, mill and overlay of existing pavement
Village of Lakewood
Installation of approximately 4,700 LF of 16-inch water main, including fire hydrants, valves in vaults, and a flushing and sampling station; including parkway restoration and driveway replacement; and other miscellaneous items of work.
Henderson Nina Water System Inc
Work includes Construction of approx. 19,500 LF of water main, 9,000 LF of 4" water main, 10,000 LF of 3" water main, flushing hydrants, valves, meters and other appurtenant and related items of construction.
Release
Oct 27, 2025
Close
Nov 10, 2025