Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Mountain View is soliciting bids for Phase 2 improvements to the Miramonte Pump Station (Project 23-43). Work includes electrical and mechanical upgrades within the existing pump station and site improvements at the Miramonte Avenue facility to ensure reliable operation during normal and emergency conditions. Bid documents are provided via the Citys BidNet Direct portal, and submissions are due by the listed closing date.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Mountain View is soliciting bids for Phase 2 improvements to the Miramonte Pump Station (Project 23-43). Work includes electrical and mechanical upgrades within the existing pump station and site improvements at the Miramonte Avenue facility to ensure reliable operation during normal and emergency conditions. Bid documents are provided via the Citys BidNet Direct portal, and submissions are due by the listed closing date.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
The City of Mountain View is soliciting bids for Phase 2 improvements to the Miramonte Pump Station (Project 23-43). Work includes electrical and mechanical upgrades within the existing pump station and site improvements at the Miramonte Avenue facility to ensure reliable operation during normal and emergency conditions. Bid documents are provided via the Citys BidNet Direct portal, and submissions are due by the listed closing date.
Premium
Access the largest public sector contact database
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Close: Dec 18, 2025
Improvements to the existing Well No. 4 pump station; improvements to two existing booster pump stations; installation of a cathodic protection system at the existing Reservoir No. 2, along with miscellaneous electrical and control improvements; construction of a new treatment building, including sodium hypochlorite and polyphosphate injection systems.
AvailableThe project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
Posted Date
Nov 21, 2025
Due Date
Dec 19, 2025
Release: Nov 21, 2025
Close: Dec 19, 2025
The project includes site preparation and installation of one (1) above ground booster pump station and other appurtenances.
AvailableConstruction of the Acequia del Ancon Phase 2 Improvements Project. The project involves the construction of a new 36" diameter high-density polyethylene (HDPE) irrigation pipeline, a reinforced concrete access structure, dumped and hand-placed riprap, and miscellaneous improvements.
Posted Date
Dec 7, 2025
Due Date
Dec 16, 2025
Release: Dec 7, 2025
Close: Dec 16, 2025
Construction of the Acequia del Ancon Phase 2 Improvements Project. The project involves the construction of a new 36" diameter high-density polyethylene (HDPE) irrigation pipeline, a reinforced concrete access structure, dumped and hand-placed riprap, and miscellaneous improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis