Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide architectural/engineering services for campus-wide fire alarm upgrades.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Providing construction manager-at-risk services associated with upgrades to existing fire alarm system.
Posted Date
Nov 19, 2025
Due Date
Jan 7, 2026
Release: Nov 19, 2025
Close: Jan 7, 2026
Providing construction manager-at-risk services associated with upgrades to existing fire alarm system.
AvailablePremium
Access the largest public sector contact database
Provide construction services for fire hazard remediations and fire alarm upgrades; fire suppression and fire alarm engineers to perform an evaluation of existing fire sprinkler protection for multiple storage areas. Their scope was to determine and design system modifications that will adequately meet the current minnesota state fire code (msfc) requirements and factory mutual (fm) global recommendations. The basis of the system design is early detection, smoke control, fire protection through control mode sprinklers, and fire department response and access.
Posted Date
Dec 10, 2025
Due Date
Feb 2, 2026
Release: Dec 10, 2025
Close: Feb 2, 2026
Provide construction services for fire hazard remediations and fire alarm upgrades; fire suppression and fire alarm engineers to perform an evaluation of existing fire sprinkler protection for multiple storage areas. Their scope was to determine and design system modifications that will adequately meet the current minnesota state fire code (msfc) requirements and factory mutual (fm) global recommendations. The basis of the system design is early detection, smoke control, fire protection through control mode sprinklers, and fire department response and access.
AvailableMinnesota State University, Mankato seeks proposals from qualified architectural and engineering firms to provide professional services for upgrades to McElroy E Hall. The solicitation provides a project documents link with the RFP materials. Proposals are due on January 15, 2026 at 2:00 pm Central Time.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Close: Jan 15, 2026
Minnesota State University, Mankato seeks proposals from qualified architectural and engineering firms to provide professional services for upgrades to McElroy E Hall. The solicitation provides a project documents link with the RFP materials. Proposals are due on January 15, 2026 at 2:00 pm Central Time.
AvailableDESIGN-BUILD services for fire suppression and alarm.
Posted Date
Oct 23, 2025
Due Date
Dec 12, 2025
Release: Oct 23, 2025
Close: Dec 12, 2025
DESIGN-BUILD services for fire suppression and alarm.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis