The City of Cincinnati is soliciting bids for the painting of the Mill Creek Road Bridge under Opportunity ID ITB-233-263C909313-1. The project requires work to commence within five days of a notice to proceed and be completed within 180 calendar days. Bidders must provide a 10% bid security and meet specific minority and women-owned business enterprise participation goals.
What to Include In Your Proposal
Starbridge can help you:
✓
Pain points mentioned in board meetings and strategic plans
✓
Instantly outline and draft all requirements
✓
Bring in your USPs and exploit competitor gaps
Win These Opportunities Next
Starbridge can help you:
✓
Get ahead of RFPs — target accounts planning budget or ending contracts soon
✓
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
✓
Starbridge.ai books 30 - 40% of leads into meetings
Files
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes bridge construction access, bonds and insurance, construction stakes, lines and grades, cpm progress schedule, clearing and grubbing within right of way, removal and disposal of existing bridge, unclassified excavation 251.000 CY, borrow excavation 4,893.000 CY, muck excavation 1,274.000 CY, geotextile, separation 1,038.000 SY, geogrid reinforcement (biaxial) 1,663.000 SY, stone bridge lift material 998.000 Ton, granular bridge lift material 100.000 CY, fine grading 1,175.000 SY, flowable fill 50.000 CY, maintenance stone 10.000 Ton, hma shoulder widening course 80.000 Ton, liquid asphalt binder pg64-22 40.000 Ton, milling existing asphalt pavement (variable) 100.000 SY. See attached file.
Work includes bridge construction access, bonds and insurance, construction stakes, lines and grades, cpm progress schedule, clearing and grubbing within right of way, removal and disposal of existing bridge, unclassified excavation 251.000 CY, borrow excavation 4,893.000 CY, muck excavation 1,274.000 CY, geotextile, separation 1,038.000 SY, geogrid reinforcement (biaxial) 1,663.000 SY, stone bridge lift material 998.000 Ton, granular bridge lift material 100.000 CY, fine grading 1,175.000 SY, flowable fill 50.000 CY, maintenance stone 10.000 Ton, hma shoulder widening course 80.000 Ton, liquid asphalt binder pg64-22 40.000 Ton, milling existing asphalt pavement (variable) 100.000 SY. See attached file.