Summary
Demolition of the all existing structures down to the existing concrete slab-on-grade with the exception of the ross tenant space, the sentara building, and as indicated. The hotel raised first floor slab, reinforced concrete mat foundation, pool, pool deck, ramps and steps shall be removed in their entirety. The work includes alterations to the ross tenant space and sentara building to maintain utility services and to provide a watertight and structurally sound exterior envelope. The work includes hazardous material abatement, demolition, construction waste management, structural steel, metal framing, sheathing, eifs system, epdm roofing, flashing, electrical, and other work.