Summary
Provide construction services which will consist of refurbishment and improvements at the Sanitary Sewer Pumping Station. Proposed work includes site work improvements, installation of new piping and equipment within the existing pump station structure and associated electrical and safety upgrades. Work to be completed shall include, but not be limited to, the following:Temporary bypass pumping of sewer flow during the construction project. Replacement of three (3) existing sewage pumps with new dry pit submersible pumps. Replacement of all fittings, pipes, valves in existing dry well structure. Installation of new control systems with SCADA integration. Installation of one (1) new comminutor on influent sewer. Replacement of all electrical components within the station. Installation of (2) two electric actuator valves and integration into pump control SCADA system for automated operation. Upgrades to existing intermediate level catwalk for improved access. Upgrades to station security by installation of electrically operated gates and installation of new security video cameras system. Demolition and removal of existing indoor generator. Furnishment and installation of new outdoor pad-mounted diesel-engine generator set. Site work including demolition, driveway and area paving reconstruction, modification to existing upstream sewer manhole, concrete pad reconstruction, fence replacement, and all other related site improvements. Architectural improvements to the pump station building including replacement of exterior doors, windows, trim, fascia, roofing, and ceiling.