Summary
Work includes but is not limited to the construction of a new 2-Story Elementary School Building. Work includes but is not limited site work, site prep, landscape/irrigation, chain link fencing, asphalt paving, traffic painting, storm water system, cast-in-place concrete, slab on grade concrete, concrete footings, concrete masonry, steel columns, steel beams, steel joists, steel stairs, architectural casework, building insulation, metal roofing, modified bitumen roofing, metal gutters/downspouts, joint sealants, steel doors/frames, wood doors, aluminum storefront, aluminum windows, gypsum board assemblies. ceramic tile, acoustical ceilings, resilient tile, carpet, paint, audio/visual equipment, toilet partitions, toilet accessories, window treatment, pre-engineered structures, hydraulic elevator, new HVAC systems, electrical power & light systems, plumbing fixtures and system, fire sprinkler system, fire alarm, communication, security, and computer network systems.