Retrieving RFP details
Release
Close
Pleasant Hill School District R-III
Work includes classroom addition at the existing middle school building as well as a new field house building consisting of a weight room and locker rooms.
Mendham Borough School District
Auditorium addition at middle school.
Eufaula School District 1
Eufaula Public School High School Event Center & Middle School addition.
Central Middle School
Project includes a 6,200 SF addition that will take place in the existing courtyard as well as a 79,290 SF renovation of the existing school. Scopes include testing, surveying, temporary and permanent fencing, building and site earthwork, asphalt and concrete paving, landscaping, utilities, selective demolition, building concrete, masonry, structural steel, metal fabrications, metal panel, rough and finish carpentry, casework, roofing, sealants and firestopping, metal wall panels, fluid air barrier, doors, coiling doors, aluminum storefront assemblies, exter- ior and interior gypsum wall assemblies, tile, acoustical ceilings and pan- els, flooring, terrazzo flooring, existing wood floor refurbishing, painting ant wall coverings, specialties, gymnasium equipment, window treatments, elevator, fire protection, mechanical and electrical work.
Release
Oct 26, 2025
Close
Nov 07, 2025