Summary
Work includes 1370 SY of erosion control blanket, 281 SY of stone dumped rip rap, cl a5, 281 SY of filter fabric, 874 ton of aggregate surface cse, type b, 1 EA of removal of existing structures, 41' pipe culvert removal, 242 CY of structure excavation, 54.4 CY of concrete structures, 1155 sf of p p conc deck beams 21" dp, furnish & erect structural stee, hardware, reinforcement bars, epoxy co, 84' steel railing, type sm, 352' furnish metal shell piles 12", 352' driving piles, 2 EA of test pile metal shell, 1 EA of name plate, 54' pipe culverts cl d, type 1, 15", 1 EA of metal flared end section, 15", 151 cy of granular backfill for structure, 36 SY of geocomposite wall drain, 4 EA concrete headwalls for pipe dr. See attached file.