Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes drilling and development of Well No. 10 including installation of associated equipment; Pitless Units, Pumps, Motors, ancillary pumping equipment and cap for well. Abandonment of Well No. 7.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes approx. 302 LF of construction of ductile iron raw water main to connect proposed Well 10 to existing well house; Site grading and restoration in vicinity of proposed Well 10. (Well drilled by others under separate contract.); Concrete pad and bollards around proposed Well 10. (Well drilled by others under separate contract.); Process piping demolition and replacement inside existing well house, including extending process piping through building footing; Concrete floor demolition and replacement inside existing well house; Cutting off existing Well 7 casing beneath existing well house floor. (Well 7 abandonment by others under separate contract.); Electrical demolition inside existing well house; Electrical improvements for proposed Well 10 including new VFD and extending power and controls to proposed Well 10 location; Replacing well feeder breaker in existing motor control center; Upgrading existing controls remote terminal unit (RTU); Painting well process piping in existing well house.
Posted Date
Jan 16, 2026
Due Date
Feb 3, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 16, 2026
Close: Feb 3, 2026
Work includes approx. 302 LF of construction of ductile iron raw water main to connect proposed Well 10 to existing well house; Site grading and restoration in vicinity of proposed Well 10. (Well drilled by others under separate contract.); Concrete pad and bollards around proposed Well 10. (Well drilled by others under separate contract.); Process piping demolition and replacement inside existing well house, including extending process piping through building footing; Concrete floor demolition and replacement inside existing well house; Cutting off existing Well 7 casing beneath existing well house floor. (Well 7 abandonment by others under separate contract.); Electrical demolition inside existing well house; Electrical improvements for proposed Well 10 including new VFD and extending power and controls to proposed Well 10 location; Replacing well feeder breaker in existing motor control center; Upgrading existing controls remote terminal unit (RTU); Painting well process piping in existing well house.
AvailableThe Virginia Department of Health issued a Quick Quote solicitation for 'Well Installation and Well Abandonment (WIIN-12_W&WA)' to procure well construction and abandonment services, including site clearing, drilled well construction, pump installation, disinfection, and required regulatory reporting. The procurement is a Small Business set-aside and is estimated between $50,000 and $200,000. The solicitation was posted Jan 23, 2026 and has a response deadline of Feb 4, 2026.
Posted Date
Jan 23, 2026
Due Date
Feb 4, 2026
Release: Jan 23, 2026
Close: Feb 4, 2026
The Virginia Department of Health issued a Quick Quote solicitation for 'Well Installation and Well Abandonment (WIIN-12_W&WA)' to procure well construction and abandonment services, including site clearing, drilled well construction, pump installation, disinfection, and required regulatory reporting. The procurement is a Small Business set-aside and is estimated between $50,000 and $200,000. The solicitation was posted Jan 23, 2026 and has a response deadline of Feb 4, 2026.
AvailableThe Virginia Department of Health issued a Quick Quote solicitation for Well Installation and Well Abandonment under the WIIN-14 program. The procurement is set aside for small businesses and has an estimated value range of $500,000 - $2,000,000. The solicitation was posted on January 23, 2026, with a response deadline of February 4, 2026.
Posted Date
-
Due Date
Feb 4, 2026
Close: Feb 4, 2026
The Virginia Department of Health issued a Quick Quote solicitation for Well Installation and Well Abandonment under the WIIN-14 program. The procurement is set aside for small businesses and has an estimated value range of $500,000 - $2,000,000. The solicitation was posted on January 23, 2026, with a response deadline of February 4, 2026.
AvailableProject consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
Posted Date
Jan 8, 2026
Due Date
Feb 10, 2026
Release: Jan 8, 2026
Close: Feb 10, 2026
Project consists of construction of Public Water Supply Well No. 5, and the Well No. 5 Pumphouse, completion of SCADA system updates, abandonment of Well No. 2, and demolition of the Well No. 2 Pumphouse. Contract A - Public Water Supply Well No. 5: Construction of a 1,200 gallon per minute (gpm) municipal well to a depth of 106 feet, well development, performance pump testing of constructed well, WDNR NR 809 water quality analysis, erosion control restoration of the work area, and other miscellaneous items in conformance with the Contract Documents. Contract B - Well No. 5 Pumphouse, SCADA Updates & Demolition of Well No. 2 Pumphouse: Construction of the Well No. 5 Pumphouse building, including furnishing and installing all well pump equipment, piping, valves, accessories and controls. The building includes a pump room, chemical room, and restroom. The Well No. 5 Pumphouse contract also includes installation of a natural gas-powered emergency electrical generator, erosion control measures, site work, site piping, driveway, pavement, restoration of the work area, pump testing, water quality testing, and other miscellaneous items in conformance with the Contract Documents. Also, to include demolition of the Well No. 2 Pumphouse including building demolition, excavation, water main and other utilities disconnections/abandonments, backfilling, grading, and site restoration. The existing Well No. 2 motor control center and well pump equipment are to be salvaged and reused in the proposed Well No. 5 Pumphouse. Well No. 2 is to be abandoned including removal and off-site disposal, or salvaging for the Owner, of existing well pump, column pipe, electrical cables, and motor, removing the casing to 3 feet below final finish grade, filling with concrete, neat cement grout or approved bentonite chips, and submitting a Well/Drillhole Abandonment Report. In addition, the project includes SCADA system updates which include removal and disposal of existing SCADA system equipment and installation of new equipment at the existing Well Nos. 1, 3, & 4, pumphouses, reservoirs site, and the proposed Well No. 5 Pumphouse.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →