Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of middle school expansion, includes, demolition; landscaping & irrigation; site work; structural steel; framing, drywall & plaster; casework & finishes; roofing & sheetmetal; doors, windows & hardware; plumbing & fire sprinklers; HVAC; electrical & low voltage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Procurement of HVAC services for the Measure E Series 4 Lakeside Middle School Expansion 2024 REBID project.
Posted Date
Dec 15, 2025
Due Date
Jan 6, 2026
Release: Dec 15, 2025
Close: Jan 6, 2026
Procurement of HVAC services for the Measure E Series 4 Lakeside Middle School Expansion 2024 REBID project.
AvailablePremium
Access the largest public sector contact database
Sale of middle school.
Posted Date
Mar 20, 2023
Due Date
Dec 31, 2025
Release: Mar 20, 2023
Close: Dec 31, 2025
Sale of middle school.
AvailableThe City of Tacoma issued a re-bid (MRP 2022-0023) for construction/improvements on E. F St. between E. 3rd St. and E. 11th St. Bidding documents and technical plans are distributed through ARC Document Solutions, and the project’s period of performance and scope are defined in those bidding documents. The opportunity is estimated at $1,000,000–$5,000,000 (AI estimate) and is listed as an open public works solicitation.
Posted Date
Dec 9, 2025
Due Date
Jan 6, 2026
Release: Dec 9, 2025
Close: Jan 6, 2026
The City of Tacoma issued a re-bid (MRP 2022-0023) for construction/improvements on E. F St. between E. 3rd St. and E. 11th St. Bidding documents and technical plans are distributed through ARC Document Solutions, and the project’s period of performance and scope are defined in those bidding documents. The opportunity is estimated at $1,000,000–$5,000,000 (AI estimate) and is listed as an open public works solicitation.
AvailableWork consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
Posted Date
Aug 18, 2025
Due Date
Jan 14, 2026
Release: Aug 18, 2025
Close: Jan 14, 2026
Work consists of chilled water infrastructure expansion bernard chiller plant. Provide ten (10) 1,250 ton chillers or five (5) 2,500 ton chillers configured to operate in series-counterflow arrangement. Electric, 480v, factory assembled, centrifugal chillers complete with compressor, motor, unit mounted variable speed drive (vsd) / adjustable frequency drive (afd), evaporator, condenser, microprocessor based integrated controls, graphics and all required ancillary equipment including permanent refrigerant pump out unit. The chillers will be field installed to operate in a headered, variable primary chilled water pumping system. See attached file for full scope.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis