Retrieving RFP details
Release
Close
City of Bay Springs
Work includes north & south wastewater treatment plant upgrades.
65-20250919101328 BAY SPRINGS
New Braunfels Utilities - Purchasing and Materials Management
Construction of an expansion of the existing North Kuehler headworks including new screening channels and mechanical screens; (ii) construction of an expansion of the existing South Kuehler headworks including new screening channels and mechanical screens; (iii) construction of new chemical disinfection equipment and rehabilitation of the existing chemical building at North Kuehler; (iv) construction of new chemical disinfection equipment and rehabilitation of the existing chemical building at South Kuehler; (v) rehabilitation of the existing North Kuehler chlorine contact basin including replacement of all gates; (vi) rehabilitation of the existing South Kuehler chlorine contact basin including replacement of all gates; (vii) replacement of the North Kuehler membrane screen systems; (viii) replacement of the South Kuehler membrane screen systems; (ix) replacement of the gravity thickener mechanism at South Kuehler; (x) construction of a new catwalk in the South Kuehler belt press truck staging area; (xi) rehabilitation of South Kuehler aeration system; (xii) replacement of the existing process blowers, canopy, and electrical building at South Kuehler; (xiii) construction of one new vehicular access bridge across the tributary between North and South Kuehler; (xiv) offsite sanitary sewer and trunk line replacement; (xv) electrical work for all power, instrumentation, controls, communication, access, and security of all WWTP facilities; (xvi) replacement of all process, membrane, and digester blowers at North Kuehler as a BID ALTERNATE; (xvii) replacement of all membrane and digester blowers at South Kuehler as a BID ALTERNATE (xviii) conversion of North Kuehler aeration to fine bubble aeration as a BID ALTERNATE; (xix) replacement of the existing NPW system at North Kuehler as a BID ALTERNATE; (xx) replacement of the existing NPW system at South Kuehler as a BID ALTERNATE; (xxi) replacement of the existing sludge valves at North Kuehler as a BID ALTERNATE; (xxii) replacement of the existing sludge valves at South Kuehler as a BID ALTERNATE; (xxiii) replacement of the North Kuehler Membrane Thickener as a BID ALTERNATE; (xxiv) replacement of the South Kuehler Membrane Thickener as a BID ALTERNATE; and (xxv) all other appurtenances necessary to complete the Project.
City of Tipton
The scope of work under this invitation will generally consist of removal and replacement of two aeration rotors and the effluent weir in the south oxidation ditch, furnishing and installing two metal walkway, electrical work and equipment, all specified and depicted appurtenances, and all other requisite and incidental materials, labor, supervision, and equipment for the completion and perfection of the project contract. See outside links for more details.
City of Collins
Work includes 2,323 LF 6" CIPP; 2,460 LF 8" CIPP; 4,280 LF 10" CIPP; 930 12" CIPP; 255 LF 15" CIPP; 50 EA CIPP lateral services; 50 EA 4" sanitary sewer service cleanout; 1,000 LF 4" SDR 26 PVCpipe sanitary sewer services (lncl. fittings); 40 LF 8" ductile iron sewer pipe; 2,322 LF 8" SDR 26 PVC sewer pipe; 2,322 LF removal of 6" gravity sewer main; 22 EA point repair (0' - 6' depth). See outside link.
Release
Sep 24, 2025
Close
Nov 06, 2025