Retrieving RFP details
Release
Close
Missouri University Of Science And Technology
Scope of work is to connect the fume hood in Lab B34 to the central hood exhaust on the roof of the penthouse. Additional scope includes the installation of a supply air valve and general exhaust air valve connected to the Phoenix Control System.
e-Builder Download_251031-034110
zip
252-Network Contract Office 12 (36C252)
Provide fume hood inspection, testing, certification / hepa filter replacement.
Metropolitan State University
Project scope#1: lower level library data center; renovation of an existing data center and storage space into a larger data closet and modified storage area. Project scope #2: academic lab renovation; renovation of the academic program area in founder's hall, the renovation of the nursing simulation lab in new main, and the fine arts renovation.
Purdue University Main Campus
Vet pathobiology research building room b003 lab renovation.
Release
Oct 28, 2025
Close
Nov 17, 2025