Summary
The Work includes the demolition of existing parking facilities and construction of a new parking lot with associated site improvements. The demolition phase consists of removal of the existing Overflow Parking Lot and Lot A, along with utilization of on-site borrow areas as required for construction activities. The construction phase includes installation of a temporary off-road haul route with culvert pipe crossings, and development of a new paved parking lot adjacent to the existing Science Lot. Improvements include grading, drainage, paving, pavement striping, and site lighting. Upon completion of construction, areas previously occupied by Lot A and designated borrow areas shall be restored by respreading stockpiled topsoil and reseeding to establish vegetative cover, resulting in conversion to green space.