Summary
Rehabilitation of the existing main pool with new retaining wall, coping, ADA chair, steps, and rails; new main pool perimeter concrete deck & ADA accessible routes; new main pool perimeter drainage infrastructure with trench drains, catch basin inlets, and sub-surface retention areas; new slide at southeast end of main pool; new main pool perimeter fencing and man-gates; new splash pad pump/filter room added to southwest corner of existing main pool building with new exterior walls, sanitary sewer service, & electrical upgrades; new splash pad on south side of main pool with drainage infrastructure, perimeter fencing with mangates, and cistern tank together with tank water service and tank overflow drainage and sanitary sewer service; remove and replace existing landscaping; new shade structure on west side of main pool with concrete, ADA BBQs, and drainage infrastructure; remove and replace existing landscaping; new rocket park playground; remove and replace existing landscaping