Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Relocation of approx. 400 LF of 8" SDR-35 PVC sanitary sewer main and associated appurtenances, cutting, capping and abandoning of existing 8" TCP sanitary sewer main and associated appurtenances, replacement of approx. four (4) existing sanitary sewer laterals from the existing 8" TCP sanitary sewer main.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
General construction work for 2025/2026 capital outlay exception project.
Posted Date
Jan 17, 2026
Due Date
Feb 11, 2026
Release: Jan 17, 2026
Close: Feb 11, 2026
General construction work for 2025/2026 capital outlay exception project.
AvailableProject consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Project consists of one prime Contract bid as a Base Bid and generally consists of the following: traffic control; bypass pumping, cleaning & televising the existing 36-inch sanitary sewer, 36-inch CIPP liner, testing & sealing lateral connections; and any necessary erosion control to complete the work. Pre-construction closed circuit televising reports are available upon request.
2025 sewer rehabilitation project.
Posted Date
Jan 12, 2026
Due Date
Feb 4, 2026
Release: Jan 12, 2026
Close: Feb 4, 2026
2025 sewer rehabilitation project.
AvailableThe Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
Posted Date
Dec 18, 2025
Due Date
Feb 5, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Feb 5, 2026
The Project includes: Contract No. 2025-01 – General/Process Mechanical: The Work to be completed under this Contract includes the construction of a concrete pad and containment area, installation of back-up pumps, yard piping, valves, sensors, switches, piping, fittings, instrumentation, a fuel tank and support stand, site preparation, concrete work, metal work, paving, grading, temporary fencing, erosion and sedimentation controls, demolition including removal of existing pipes, valves, equipment, a stormwater manhole, and filling and abandonment of the overflow pipe from the wet well. Contract No. 2025-02 – Electrical: The work to be completed under this Contract includes the installation of new electric panels, transformers, PLC control cabinet, motor control center, variable- frequency drives, safety disconnects, sensor arrays, junction boxes, conduit and wiring, selective electrical demolition, electrical modifications, startup, and all other items specified in the Contract Documents, or shown or indicated on the Drawings.
Available