Summary
Project consists of constructing an expansion to the airport's existing hangar facility, including minor associated site work. Work includes a four-unit pre-engineered metal building (PEMB) with aircraft doors, electrical service and lighting, heating and ventilation systems, and reinforced concrete foundations. The Contractor shall be responsible for the complete design and engineering of the building system and foundations, including preparation and submission of all signed and sealed drawings and calculations required for permitting, fabrication, and construction in accordance with the Contract Documents and applicable codes.