Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
General information: A steel clear-span pole style building was recently erected at Marietta Repair Station. The building is 30’ X 100’ and with 2 separate floors. Work is finishing up with the HVAC, plumbing, electric, etc. The building is now ready for the flooring system to be installed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The U.S. Army Corps of Engineers, Huntington District issued Solicitation W91237-26-Q-A022 for the rebuild of a right angle gearbox at Delaware Dam. The contractor must pick up, clean, inspect, rehabilitate, test, and return one right angle gearbox to original specifications within 16 weeks after award. This procurement is a Small Business set-aside with solicitation documents available through the PIEE Solicitation Module.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
The U.S. Army Corps of Engineers, Huntington District issued Solicitation W91237-26-Q-A022 for the rebuild of a right angle gearbox at Delaware Dam. The contractor must pick up, clean, inspect, rehabilitate, test, and return one right angle gearbox to original specifications within 16 weeks after award. This procurement is a Small Business set-aside with solicitation documents available through the PIEE Solicitation Module.
AvailableThe contractor shall furnish labor, tools, material and equipment necessary to provide dumpster services
Posted Date
Jan 21, 2026
Due Date
Feb 11, 2026
Release: Jan 21, 2026
Close: Feb 11, 2026
The contractor shall furnish labor, tools, material and equipment necessary to provide dumpster services
AvailableDam right angle gearbox rebuild.
Posted Date
Jan 23, 2026
Due Date
Feb 12, 2026
Release: Jan 23, 2026
Close: Feb 12, 2026
Dam right angle gearbox rebuild.
AvailableThe contractor shall furnish all labor, tools, materials, equipment, and supervision to perform sewer and sludge removal from project holding, recirculating tanks and lift stations. Provide emergency pumping services outside of normal hours of operation, peak seasons and holiday weekends with reasonable notice. Provide emergency pump outs within six (6) hours of notice. Task A: Provide scheduled routine pumping and debris removal from lift stations, sewer plant and vault toilets located within Burnsville Lake Project recreation areas during normal operation hours and completed within forty-eight (48) hours of request. Waste shall be removed and taken off site to a certified sewer treatment facility IAW local and state guidelines. Only to be invoiced for service rendered. Task B: Provide a combined emergency pumping of holding tanks, lift stations and sewer tanks within a six (6)-hour notice. To include after normal work hours, weekends and holidays. Waste shall be removed and taken off site to a certified sewer treatment facility IAW local and state guidelines. Only to be invoiced for service rendered. See attached file.
Posted Date
Jan 10, 2026
Due Date
Jan 26, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 26, 2026
The contractor shall furnish all labor, tools, materials, equipment, and supervision to perform sewer and sludge removal from project holding, recirculating tanks and lift stations. Provide emergency pumping services outside of normal hours of operation, peak seasons and holiday weekends with reasonable notice. Provide emergency pump outs within six (6) hours of notice. Task A: Provide scheduled routine pumping and debris removal from lift stations, sewer plant and vault toilets located within Burnsville Lake Project recreation areas during normal operation hours and completed within forty-eight (48) hours of request. Waste shall be removed and taken off site to a certified sewer treatment facility IAW local and state guidelines. Only to be invoiced for service rendered. Task B: Provide a combined emergency pumping of holding tanks, lift stations and sewer tanks within a six (6)-hour notice. To include after normal work hours, weekends and holidays. Waste shall be removed and taken off site to a certified sewer treatment facility IAW local and state guidelines. Only to be invoiced for service rendered. See attached file.