Summary
This contract is for the construction of electrical and mechanical improvements. The work also involves: install medium voltage cables in existing conduit from existing medium voltage sub station to new medium voltage transformer; furnish and install a medium voltage transformer; furnish and install new 460 Volt switchboard; furnish and install two wayside power stations; furnish new underground conduit to the wastewater treatment plant; furnish and install a power monitoring system; construction of concrete pads for electrical equipment; construction of underground power distribution, including trenching, directional drilling, cabling, and conduits; construction of compressed air sstem pipe and two compressed air stands and outlets; furnish EV charging stations and related power, and electrical devices.