Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of White Sulphur Springs
Work includes installation of approx. 3,140 LF of 8" waterline, 8" PVC, C-900 DR 18, 100 GPM booster pump station upgrade, construction of a new tank access road, 40,000 gallon water storage tank, foundation, valve vault, tank mixer, and related appurtenances.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of White Sulphur Springs
Construction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.
Posted Date
Dec 3, 2025
Due Date
Jan 6, 2026
Release: Dec 3, 2025
City of White Sulphur Springs
Close: Jan 6, 2026
Construction of water system infrastructure: installation of approximately 3,140 linear feet of 8-inch waterline, upgrade of a 100 GPM booster pump station, construction of a new tank access road, and construction/installation of a 40,000-gallon water storage tank with foundation, valve vault, tank mixer, and related appurtenances.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Middlesex
Elevated water storage tank.
Posted Date
Dec 5, 2025
Due Date
Jan 15, 2026
Release: Dec 5, 2025
Town of Middlesex
Close: Jan 15, 2026
Elevated water storage tank.
AvailableHeadwaters Soil And Water Conservation District
Work includes installation of a 0.5 million gallon ground storage tank and appurtenances associated with the tank and the surrounding area within 20 feet of the tank structure.
Posted Date
Nov 14, 2025
Due Date
Jan 14, 2026
Release: Nov 14, 2025
Headwaters Soil And Water Conservation District
Close: Jan 14, 2026
Work includes installation of a 0.5 million gallon ground storage tank and appurtenances associated with the tank and the surrounding area within 20 feet of the tank structure.
AvailableLondon Community Service Dist
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
London Community Service Dist
Close: Dec 18, 2025
Construction of improvements to an existing municipal water well (well no. 5), welded steel water storage tank, booster pump system, hydropneumatic tank, emergency electrical generator, automatic transfer switch, site earthwork, surfacing, fencing, pipeline connection to the water distribution system, electrical building, electrical, controls, instrumentation, pg&e new service installation/connection and well no 1 destruction
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →