Summary
The City of Brewer, Maine is soliciting sealed bids for a storm drain replacement project on Maple Street from South Main Street to Winter Street. The work involves replacing a failing section of vitrified clay pipe with 12-inch HDPE MaineDOT Option III dual wall pipe, installing a doghouse manhole, reconnecting existing structures and catch basins, replacing the existing roadway fabric layer, and paving the trench to match existing depths. Sealed bid envelopes, distinctly marked "2026 Maple Street Storm Drain Replacement Project", must be received at the Office of Jeremy Caron, Brewer Engineering Department, 221 Green Point Road, Brewer, ME by 11:00 AM on Thursday, July 23, 2026; the project must be completed before June 25, 2027.