Summary
Provide makah 200-line sewer bypass. The statement of Work proposes to install a new Agency Creek Lift Station with associated civil, mechanical, electrical, grading and erosion control work, approximately 6,500 LF of 8” PVC sewer force main, one 30 kW mobile generator, one carport structure, associated electrical power and control systems, and a gravity sewer line switch-over. The work will also include bypassing the existing gravity sewer main, connecting the force main outfall to the existing sewer manhole, and adding lightning protection devices at the new lift station. The work will require a sewer bypass to maintain continuity of services and prevent sewage spills during construction, trench protection, traffic control, and potential groundwater de-watering. See attached file.