The Work consists of four schedules: 1. Schedule 1 – West Main Street: The Work consists of construction of approx. 1,030 LF of replacement sanitary sewer main, replacement of service piping, excavation, backfill, demolition, pipe abandonment, base repair, compaction, surface restoration, connections to existing piping and structures, system testing, temporary bypass pumping, commissioning, erosion control, traffic control, road base repairs, test pits, and other work as defined in the bid documents. 2. Schedule 2A – Main Street Highway: The Work consists of lining of approx. 740 LF of sanitary sewer main, lining of service piping, system testing, temporary bypass pumping, commissioning, erosion control, traffic control, and other work as defined in the bid documents. 3. Schedule 2B – Pine Street: The Work consists of lining of approx. 320 LF of sanitary sewer main, lining of service piping, system testing, temporary bypass pumping, commissioning, erosion control, traffic control, and other work as defined in the bid documents. 4. Schedule 3 (Base Bid) – Grant Street: The Work consists of construction of approx. 2,370 LF of new and replacement sanitary sewer main and 2 new manholes, replacement of service piping, replacement of approx. 860 LF of existing water main and valves, excavation, backfill, demolition, pipe abandonment, compaction, surface restoration, connections to existing piping and structures, system testing, temporary bypass pumping, commissioning, erosion control, traffic control, test pits, and other work as defined in the bid documents.