Summary
•Furnish and Install temporary traffic control barricades, signage, road closures; \r •Furnish and Install erosion and sediment control devices; \r •Saw approximately 188 LF of Asphalt Concrete Pavement; \r •Remove approximately 120 SY of Asphalt Concrete Pavement; \r •Approximately 264 CY of Unclassified Excavation; \r •Furnish and Install approximately 320 SY of Type B Drainage Fabric; \r •Furnish and Install approximately 270 ton of Type 1 Drainage Rock; \r •Remove approximately 70 LF of Storm Sewer Pipe; \r •Furnish and Install approximately 70 LF of Storm Sewer Pipe; \r •Furnish and Install approximately 120 SY of Geotextile Fabric; \r •Furnish and Install approximately 100 Ton of Base Course; \r •Furnish and Install approximately 120 SY of 4” Asphalt Concrete.