Summary
The contractor shall provide all necessary labor, materials, and equipment to perform the cleaning of the vessel's air conveyance systems. Technically competent with experience with Novenco FRC-515-P1, single piping, ABS, 3 phase X 450 V, 60HZ marine ventilation system or equivalent. The scope includes, but is not limited to, the following procedures: Site Preparation: Lock-Out/Tag-Out: Exhaust fans will be locked out by the Ships Engineering Watchstander and the Customer. Protective Covering: Cover all machinery, office equipment, furniture, and other components with plastic or drop cloths. See attached file.