Discover Opportunities months before the RFP drops
Learn more βRetrieving RFP details
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
NAVFAC Mid-Atlantic
Installation of new pre-fabricated / pre-engineered, drainable, dryable, testable underground piping system. The steam and condensate lines will be installed in the exisiting location of the present lines as much as possible. All pipe expansions shall be allowed for utilizing expansion loops. Sections of sidewalks, roads, and pavement areas where the piping is schduled for demolition for new steam or condensate lines shall be demolished. All surface and subsurface conditions shall be restored. Hazardous materials in the excavation area will be abated.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs β target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
NAVFAC Mid-Atlantic
The work for this project includes the replacement of two chillers, remove or alter existing work, repair or replace portions of existing work which had been altered during construction operations.
Posted Date
Nov 10, 2025
Due Date
Dec 5, 2025
Release: Nov 10, 2025
NAVFAC Mid-Atlantic
Close: Dec 5, 2025
The work for this project includes the replacement of two chillers, remove or alter existing work, repair or replace portions of existing work which had been altered during construction operations.
AvailableNAVFAC Mid-Atlantic
1. Remove the quartz and brick paver system (made of loose laid 4β x 8β bricks 2β thick, with infill of pea stone on rubber spacers), completely, in the work area. 2. Dispose of all materials appropriately. 3. Fine grade and mechanically compact the soil underneath the existing plaza to restore original design grades (grades should be so that water drains to the northwest). 4. Provide an adequate LID system, including drainage, filtration and a retention basin. The location of the LID system is to be determined. 5. Install a 6-inch lift of crushed stone as a bedding layer for the plaza. Slope stone to match underlying soil. 6. Install galvanized welded-wire fabric, 6x6, 8-guage, and secured to galvanized metal chairs so that the mesh will fall within the middle third of the 6-inch final layer. 7. Install 6-inch thick concrete, fiber reinforced, 5000 psi. Agitate and level throughout, sloping to drain to match existing. Finish shall have slight non-slip surface. See attached file.
Posted Date
Nov 12, 2025
Due Date
Nov 21, 2025
Release: Nov 12, 2025
NAVFAC Mid-Atlantic
Close: Nov 21, 2025
1. Remove the quartz and brick paver system (made of loose laid 4β x 8β bricks 2β thick, with infill of pea stone on rubber spacers), completely, in the work area. 2. Dispose of all materials appropriately. 3. Fine grade and mechanically compact the soil underneath the existing plaza to restore original design grades (grades should be so that water drains to the northwest). 4. Provide an adequate LID system, including drainage, filtration and a retention basin. The location of the LID system is to be determined. 5. Install a 6-inch lift of crushed stone as a bedding layer for the plaza. Slope stone to match underlying soil. 6. Install galvanized welded-wire fabric, 6x6, 8-guage, and secured to galvanized metal chairs so that the mesh will fall within the middle third of the 6-inch final layer. 7. Install 6-inch thick concrete, fiber reinforced, 5000 psi. Agitate and level throughout, sloping to drain to match existing. Finish shall have slight non-slip surface. See attached file.
NAVFAC Mid-Atlantic
This project will demolish an existing condemned US Navy pier (1,570β long x 100β wide) and construct a new pier (1,000β long x 80β wide) for four Offshore Patrol Cutters (OPCs), along with a new bulkhead (360β long), laydown area, parking, stormwater management, fire/potable water, electrical, telecommunications & compressed air utilities, etc.
Posted Date
Nov 19, 2025
Due Date
Dec 1, 2025
Release: Nov 19, 2025
NAVFAC Mid-Atlantic
Close: Dec 1, 2025
This project will demolish an existing condemned US Navy pier (1,570β long x 100β wide) and construct a new pier (1,000β long x 80β wide) for four Offshore Patrol Cutters (OPCs), along with a new bulkhead (360β long), laydown area, parking, stormwater management, fire/potable water, electrical, telecommunications & compressed air utilities, etc.
AvailableOrange County Transportation Authority
To provide services for the Newport Transportation Center and Fire Station No. 3 relocation feasibility study.
Posted Date
Nov 15, 2025
Due Date
Dec 17, 2025
Release: Nov 15, 2025
Orange County Transportation Authority
Close: Dec 17, 2025
To provide services for the Newport Transportation Center and Fire Station No. 3 relocation feasibility study.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo βVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis