Summary
Work consist of 33,977 SF of clearing and gurbbing, 33,977 SF of site grading and soil preperation, 20 CY of mulch for tree protection, 276 SF of removal of existing hardscape - concrete sidewalk, 8 EA of remove existing trees, 341 LF of remove existing curb, 737 LF of remove existing fence, 714 LF of tree protection barrier, 480 LF of site protection barrier, 5,325 SF of concrete pavement, 260 LF of expansion joints, 3 EA of ADA ramps, 381 LF of concrete band, 1,862 SF of colored concrete, 8 CY of crushed gravel, 3,960 SF of artificial turf, 2,006 SF of engineered wood fiber mulch, 870 SF of asphalt. See attached file.