Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Rehabilitation of one (1) 1,000,000-gallon welded steel water storage tank. The tank dimensions are 30' tall and 76' in diameter. The tank roof is supported with interior beams and columns. There are two manway hatches at ground level and one roof hatch. There is an interior ladder and an exterior ladder. There is a vent and antennas on the roof with wires along the exterior ladder.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Rehabilitation of an existing 500,000-gallon composite (welded steel and concrete) elevated water tank, including exterior steel bowl overcoat, interior steel bowl rehabilitation and application of approved NSF and AWWA D102 coating system, and recoating interior dry area metal surfaces following rehabilitation of any area that exhibits corrosion. Work shall also include replacement of the cathodic protection system, installation of a tank mixing system, and recommended safety upgrades.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
Rehabilitation of an existing 500,000-gallon composite (welded steel and concrete) elevated water tank, including exterior steel bowl overcoat, interior steel bowl rehabilitation and application of approved NSF and AWWA D102 coating system, and recoating interior dry area metal surfaces following rehabilitation of any area that exhibits corrosion. Work shall also include replacement of the cathodic protection system, installation of a tank mixing system, and recommended safety upgrades.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Work includes interior rehabilitation and miscellaneous metal repairs and improvements of a water tank with a two-million-gallon reservoir with a 93-foot diameter and a sidewall height of 40 feet.
AvailableThe City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
Posted Date
Dec 7, 2025
Due Date
Jan 27, 2026
Release: Dec 7, 2025
Close: Jan 27, 2026
The City of Cotter, Arkansas is soliciting proposals for painting and rehabilitation of two water storage tanks (a 90x30 welded steel standpipe and a 12x44' riveted ground storage tank). Firms must provide a price for rehabilitation of each tank and submit sealed proposals with a 5% bid bond; proposals must be mailed or delivered to Cotter City Hall. The City reserves the right to waive formalities and reject any or all proposals; the RFP/specifications are available from the Cotter Mayor (mayor@cotterar.gov) or at City Hall.
AvailableThe work consist of approx 100 SQ IN welded pit repairs in tank; 1 LS abrasive blast and paint tank exterior; 1 LS add 4" steel overflow pipe to ground with splash pad; 1 LS top vent renovation and roof entry welding repairs; 1 LS install catwalk level entry and ladder.
Posted Date
Jan 19, 2026
Due Date
Feb 17, 2026
Release: Jan 19, 2026
Close: Feb 17, 2026
The work consist of approx 100 SQ IN welded pit repairs in tank; 1 LS abrasive blast and paint tank exterior; 1 LS add 4" steel overflow pipe to ground with splash pad; 1 LS top vent renovation and roof entry welding repairs; 1 LS install catwalk level entry and ladder.