Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes bridge joint replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes bridge joint replacement.
Posted Date
Dec 16, 2025
Due Date
Jan 14, 2026
Release: Dec 16, 2025
Close: Jan 14, 2026
Work includes bridge joint replacement.
AvailablePremium
Access the largest public sector contact database
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
Posted Date
Dec 9, 2025
Due Date
Jan 16, 2026
Release: Dec 9, 2025
Close: Jan 16, 2026
Bridge joint replacement, structural steel repairs, floor drain extension, and deck sealer. See outside link.
AvailableWork includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
Posted Date
-
Due Date
Jan 16, 2026
Release: -
Close: Jan 16, 2026
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
AvailableReplacement of Bridge
Posted Date
-
Due Date
Feb 2, 2026
Release: -
Close: Feb 2, 2026
Replacement of Bridge
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis