Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 444 SY hot-mix asphalt surface removal - butt joint; 130 ton hot-mix asphalt surface course, IL-9.5, mix "D", N70; 16 SY protective coat; 719 SY hot-mix asphalt surface removal, 1/4"; 147 SF relief joint 3"; 16. 4 CY concrete superstructure; 980 pound reinforcement bars, epoxy coated; 171 SF preformed joint strip seal; 388 SF combination concrete curb and gutter, type B-6. 24; 559 SY bridge deck latex concrete overlay, 2 3/4"; 559 SY bridge deck scarification 3/4"; 46 SF structural repair of concrete (depth equal to or less than 5").
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes 459 SF precast prestressed concrete I-beam repair; 267 sy concrete pavement scarification; 1,068 SY bridge deck latex concrete overlay, 2 1/2"; 4,860 SY bridge deck latex concrete overlay 3 3/4"; 3,772 SY bridge deck grooving (longitudinal); 5,493 SF grooving for recessed pavement marking 7"; 4,506 SF polyurea pavement marking type ii - line 6"; 6,011 sf pavement marking blackout tape, 7"; 8 EA. Temporary rumble strips; 328 SF preformed joint strip seal; 757 SY hot-mix asphalt shoulders, 10".
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 459 SF precast prestressed concrete I-beam repair; 267 sy concrete pavement scarification; 1,068 SY bridge deck latex concrete overlay, 2 1/2"; 4,860 SY bridge deck latex concrete overlay 3 3/4"; 3,772 SY bridge deck grooving (longitudinal); 5,493 SF grooving for recessed pavement marking 7"; 4,506 SF polyurea pavement marking type ii - line 6"; 6,011 sf pavement marking blackout tape, 7"; 8 EA. Temporary rumble strips; 328 SF preformed joint strip seal; 757 SY hot-mix asphalt shoulders, 10".
AvailableWork includes 1,469 SF thermoplastic pavement marking - line 4"; 290 sf modified urethane pavement marking - line 4"; 1,469 SF grooving for recessed pavement marking 5"; 9 EA. Guardrail reflectors, type c (special); 468 SY bridge deck scarification 3/4"; 468 sy bridge deck latex concrete overlay, 2 1/4"; 3 SF structural repair of concrete (depth equal to or less than 5 inches); 69 sy deck slab repair (full depth, type ii); 412.5 SF steel plate beam guardrail, type a, 6 foot posts.
Posted Date
-
Due Date
Jan 16, 2026
Close: Jan 16, 2026
Work includes 1,469 SF thermoplastic pavement marking - line 4"; 290 sf modified urethane pavement marking - line 4"; 1,469 SF grooving for recessed pavement marking 5"; 9 EA. Guardrail reflectors, type c (special); 468 SY bridge deck scarification 3/4"; 468 sy bridge deck latex concrete overlay, 2 1/4"; 3 SF structural repair of concrete (depth equal to or less than 5 inches); 69 sy deck slab repair (full depth, type ii); 412.5 SF steel plate beam guardrail, type a, 6 foot posts.
The work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
Posted Date
Dec 9, 2025
Due Date
Jan 21, 2026
Release: Dec 9, 2025
Close: Jan 21, 2026
The work consist of approx 607.8 SY deck repair; 1,899.5 SY fiber reinforcement for concrete repair/overlay; 535.9 class 13 waste excavation; 1,286.4 SY 9" hot mixed asphalt mixture paved shoulder; 332.9 SY bridge approach; 1,997.6 SY leveling or strengthening course wedge hot mixed asphalt mixture.
AvailableBridge deck replacement.
Posted Date
-
Due Date
Jan 8, 2026
Release: -
Close: Jan 8, 2026
Bridge deck replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis