Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction services related to landfill gas collection and control system expansion, phase I.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
Posted Date
Nov 18, 2025
Due Date
Dec 17, 2025
Premium
Access the largest public sector contact database
Release: Nov 18, 2025
Close: Dec 17, 2025
Furnish and install 6 (six) standard vertical extraction wells and 3 vertical extraction wells with slip casings. Furnish and install approx. 350 LF of 12" of HDPE gas conveyance piping. Furnish and install approx. 130 LF of 6" HDPE gas conveyance piping. Furnish and install approx. 140 LF of 6" HDPE gas conveyance piping in common trench with 2" of HDPE compressed air piping and 4" of HDPE condensate forcemain piping. Furnish and install approx. 130 LF of 2" HDPE compressed air piping and in common trench with 4" HDPE condensate forcemain piping. Furnish and install all wellheads, fittings, valves and appurtenances. Furnish and install 3 (three) vertical extraction well dewatering pumps and appurtenances. Pull and relocate 2 (two) existing vertical extraction well dewatering pumps, including furnishing new tri-hose tubing. Furnish and install 2 (two) LFG isolation valves. Furnish and install 4 (four) force main air relief valves. Abandonment of existing LFG conveyance piping, compressed air piping, and force main piping below grade. Abandonment of 9 (nine) vertical extraction wells; three having slip casings. Surveying, site preparation, erosion and sediment controls and restoration.
AvailableReplace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
Posted Date
Nov 7, 2025
Due Date
Jan 6, 2026
Release: Nov 7, 2025
Close: Jan 6, 2026
Replace and reconfigure the 4 Interior Header for the landfill gas collection system at Cedar Hills Regional Landfill. The work includes decommissioning of existing HDPE piping, installation of new HDPE piping, excavation, geosynthetic repair/restoration, installation of valve assemblies, condensate, and well head controls, stormwater piping, and surface restoration.
AvailableWork consists of construction of an approx 2.5-acre landfill cell comprised mostly of side slopes. The work will include construction of a composite liner with a leachate collection and removal system.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Work consists of construction of an approx 2.5-acre landfill cell comprised mostly of side slopes. The work will include construction of a composite liner with a leachate collection and removal system.
AvailableWork consists of construction of an approx 2.5-acre landfill cell comprised mostly of side slopes. The work will include construction of a composite liner with a leachate collection and removal system.
Posted Date
Nov 6, 2025
Due Date
Dec 18, 2025
Release: Nov 6, 2025
Close: Dec 18, 2025
Work consists of construction of an approx 2.5-acre landfill cell comprised mostly of side slopes. The work will include construction of a composite liner with a leachate collection and removal system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis